Skip to main content
Burnaby

Burnaby의 Cabinet Refacing

Trusted kitchen, bathroom, and whole-house renovations for Burnaby homes, condos, and townhouses.

Burnaby의 Cabinet Refacing 소개

Cabinet refacing — also called cabinet resurfacing — gives your kitchen a completely new look without the cost or disruption of a full renovation. By replacing only the doors, drawer fronts, and hardware while keeping the existing cabinet boxes, you get a dramatic transformation in just 5–7 days at 40–60% less than full cabinet replacement.

This is one of our most popular services for homeowners who have solid, well-built cabinet boxes but dated styles — dark oak from the 1990s, honey maple from the 2000s, or thermofoil doors that are peeling. If your cabinet boxes are structurally sound (no water damage, no sagging shelves), refacing is an excellent value.

**What cabinet refacing includes:** - Removal of existing doors, drawer fronts, and hardware - Veneer application to visible cabinet box surfaces (matching your new door style) - New doors in your chosen style: shaker, slab, raised panel, or transitional - New drawer fronts to match - New hardware: handles, knobs, hinges (soft-close upgrade included) - New crown moulding and light rail (optional) - Touch-up painting or finishing on cabinet interiors - Under-cabinet LED lighting installation (optional add-on)

**Door material options:** - Spray-painted MDF: most popular, smooth finish, any colour, from $150/door - Thermofoil: budget-friendly, wipe-clean surface, limited styles - Solid wood: premium option, natural grain, traditional feel - Acrylic/high-gloss: ultra-modern, reflective surface

**Real project pricing from our portfolio:** - Standard refacing (10–15 doors, new hardware): $8,000–$12,000 - Mid-range (doors + drawer fronts + crown moulding + LED): $12,000–$18,000 - Premium (solid wood doors + quartz countertop add-on): $18,000–$25,000

We serve all of Metro Vancouver for cabinet refacing — from Vancouver condos to Langley homes to Port Moody townhouses. The typical project takes just 5–7 working days, and you can use your kitchen throughout most of the process (only 1–2 days of limited access during veneer application).

Cabinet refacing pairs perfectly with countertop replacement. Many clients combine a door/drawer refacing with new quartz countertops for a complete kitchen transformation under $20,000. We can coordinate both services for a seamless result.

Every cabinet refacing project includes a 3-year workmanship warranty on doors, hardware, and installation.

Burnaby의 Cabinet Refacing 서비스

Reno Stars delivers quality renovations across Burnaby's diverse neighbourhoods — from the high-rise towers and luxury condos of Metrotown and Brentwood Park, to the quieter single-family streets of Deer Lake, Edmonds, Capitol Hill, and South Slope. As one of BC's most densely populated municipalities, Burnaby presents a unique mix of renovation challenges and opportunities, and our team has the hands-on experience to handle them all.

**Condo and Townhouse Specialists**

The majority of Burnaby's housing stock is strata-governed, which means renovation work requires careful coordination: strata approval, noise-hour scheduling, elevator booking, and debris removal protocols. Our team manages all strata logistics as a standard part of every project. From compact 600 sq ft condo bathrooms to full townhouse kitchen overhauls, we maximize every square foot without compromising on quality.

**Real Project Costs from Burnaby**

Our completed Burnaby projects give you real-world benchmarks to plan your budget:

- **[bathroom renovation](/en/guides/bathroom-renovation-cost-vancouver/)s:** $20,000–$32,000 depending on scope. A standard bathroom update (new vanity, tile, fixtures) runs $20,000–$25,000 in 2–3 weeks. A full master ensuite with custom features takes 3–5 weeks and costs $26,000–$32,000. - **[kitchen renovation](/en/guides/kitchen-renovation-cost-vancouver/)s:** $30,000–$40,000 for a full custom build. Our Burnaby kitchen projects use custom cabinetry (white shaker, wood-vein, and painted finishes), quartz countertops, and modern fixtures. Timeline: 4–6 weeks. - **Commercial renovations:** $8,000–$25,000 for retail and commercial spaces. We've completed retail fit-outs at Metrotown-area locations with minimal disruption to surrounding tenants.

**Neighbourhoods We Serve**

We work throughout all of Burnaby, including Metrotown, Brentwood, Lougheed, South Burnaby, Deer Lake, Capitol Hill, Edmonds, Highgate, and Sullivan Heights. Whether your unit is in a Brentwood pre-sale tower or a 1970s bungalow near Burnaby Lake, we bring the same standard of workmanship.

**3-Year Warranty, Licensed & Insured**

All Reno Stars projects come with a 3-year workmanship warranty. We're fully licensed and insured in BC, and we carry the strata-required liability coverage for work in managed buildings.

## Burnaby Renovation Cost Guide

Based on completed Burnaby projects by Reno Stars:

- **Kitchen renovation:** $25,000–$55,000 (condo kitchen from $25K, full house kitchen from $35K+) - **Bathroom renovation:** $18,000–$35,000 (see our [Vancouver bathroom cost guide](/en/blog/average-bathroom-renovation-cost-vancouver/)) - **Basement renovation:** $30,000–$80,000 (finished rec room or legal suite) - **Whole-house renovation:** $80,000–$200,000+

## Burnaby Neighbourhoods

We serve all Burnaby areas including Metrotown, Brentwood, Edmonds, Deer Lake, Burnaby Heights, Capitol Hill, and the University area. Burnaby's high-rise condos, townhouse complexes, and single-family homes each require different renovation approaches and strata considerations.

## Burnaby Strata Renovation Rules

Many Burnaby renovations are in strata buildings. We handle strata applications, insurance certificates, work-hour compliance, and neighbour notifications. Our team knows the requirements for major Burnaby strata buildings, saving you weeks of paperwork.

Read more: [Bathroom renovation costs](/en/blog/average-bathroom-renovation-cost-vancouver/) | [Kitchen renovation costs](/en/guides/kitchen-renovation-cost-vancouver/) | [Basement renovation guide](/en/blog/basement-renovation-vancouver-complete-guide/)

사업 분야

Cabinet Door ReplacementDrawer Front ReplacementHardware UpgradeSoft-Close HingesShaker Style DoorsHigh-Gloss FinishWood Grain DoorsCountertop UpgradeCabinet Resurfacing

Burnaby 서비스를 선택하는 이유

Condo and townhouse renovation specialists
Full strata coordination — approvals, scheduling, cleanup
Real project costs: bathrooms $20K–$32K, kitchens $30K–$40K
Custom cabinetry, quartz countertops, modern fixtures
Serving Metrotown, Brentwood, Edmonds, Deer Lake & all Burnaby areas
3-year warranty, BC licensed & insured

Burnaby의 Cabinet Refacing에 대해 자주 묻는 질문

Yes, we have extensive experience renovating high-rise condos throughout Burnaby, including towers in Metrotown, Brentwood, and Edmonds. We work within strata bylaws and coordinate material deliveries, noise-hour restrictions, and elevator bookings. Our project managers handle all strata communication so the process is seamless for you.

Based on our completed Burnaby projects, bathroom renovations typically range from $20,000 to $32,000. A standard update — new vanity, tile, fixtures, and lighting — runs $20,000–$25,000 and takes 2–3 weeks. A full master ensuite with custom features and freestanding tub costs $28,000–$32,000 and takes 3–5 weeks. These prices include labour, materials, and permits.

A full kitchen renovation in Burnaby typically takes 4–6 weeks from start to finish. This includes demolition, rough-in plumbing and electrical updates, cabinet installation, countertop fabrication and installation, backsplash tiling, and appliance connection. Burnaby condo projects may take slightly longer due to strata scheduling requirements for tradespeople and elevator bookings.

Yes. We manage all strata coordination as part of our service. This includes helping you prepare the renovation application (scope description, insurance certificates, trades list), scheduling work within approved noise hours, booking elevator access, and ensuring cleanup meets the strata's requirements. We've completed renovations in dozens of Burnaby strata buildings and understand the process inside out.

Burnaby has many homes on hillsides — especially around Capitol Hill, Burnaby Mountain, and the Deer Lake area. Sloped lots can affect drainage and moisture. We assess grading, waterproofing, and egress requirements before finishing any Burnaby basement, ensuring the space meets BC Building Code for habitable rooms.

Yes, we frequently renovate townhouses in Burnaby's major developments. We coordinate with strata management, handle shared-wall considerations, and work within the building's noise and access rules. Kitchen and bathroom renovations are our most common townhouse projects in these areas.

리페이싱은 기존 캐비닛 박스를 유지하고 도어, 서랍 전면, 하드웨어를 교체합니다. 전체 교체보다 40-50% 저렴하며 시간도 적게 걸립니다.

Burnaby에서 평균 주방의 캐비닛 리페이싱은 일반적으로 3-5일이 걸립니다. 프로세스 대부분 동안 주방은 기능을 유지합니다.

대부분의 원목과 합판 캐비닛 박스는 구조적으로 견고하다면 리페이싱할 수 있습니다. Burnaby에서 무료 가정 방문 상담 중 캐비닛을 평가합니다.

Burnaby에서 Cabinet Refacing 프로젝트를 시작할 준비가 되셨나요?

20년의 경험으로 귀하의 비전을 현실로 변화시키겠습니다.