Skip to main content
Rénovation de salle de bain dans Vancouver
Vancouver

Rénovation de salle de bain dans Vancouver

Real Vancouver rénovation de salle de bain costs, timelines and completed local projects — transparently.

Real Rénovation de salle de bain Costs in Vancouver

Based on 2 completed rénovation de salle de bain projects in Vancouver

$14K – $40K
Price Range
$27K
Average
2
Projects
3 yrs
Warranty

À propos de Rénovation de salle de bain dans Vancouver

Reno Stars provides rénovation de salle de bain for homeowners across Vancouver and Metro Vancouver.

Vancouver rénovations de salle de bains — conception, démolition, imperméabilisation, carrelage, plomberie, électricité, éclairage, luminaires et finitions sur mesure. Salles d'eau aux salles de bains principales complètes. Nous travaillons dans des maisons unifamiliales, des condos, des maisons de ville et des suites dans une ruelle à travers…

Ce que nous faisons

Douche à l'italienneConversion baignoire-doucheVanité personnaliséeTravaux de carrelageBoîtier en verre sans cadreMiroirs LEDImperméabilisationPlancher ChauffantDouche sans seuilConception accessible

Pourquoi choisir notre service Vancouver

Expérience avec les réglementations et les permis des strates de Vancouver
Spécialistes en rénovation de maisons patrimoniales et de caractère
Matériaux résistants à l'humidité pour le climat côtier
Autorisé et assuré pour les projets de la ville de Vancouver
Consultation gratuite sur place et estimations détaillées

Partager :

Projet récent Rénovation de salle de bain à Vancouver

Budget réel, calendrier réel, étendue réelle de notre portefeuille.

Salle de bains de luxe européenne Champagne Gold — Côté Ouest Vancouver — featured project
Vancouver

Salle de bains de luxe européenne Champagne Gold — Côté Ouest Vancouver

Une salle de bains principale de luxe Vancouver de West Side transformée à partir d'un papier peint damassé des années 1990, d'une douche à cadre doré et de petits carreaux de mosaïque en une retraite de style européen en or champagne. Les murs en marbre crème s'étendent du sol au plafond, toute la quincaillerie unifiée en or champagne (robinet, ensemble de douche, poignées de porte, éclairage, cadres de miroir, bord de niche), et la baignoire profonde d'origine est conservée mais recadrée en marbre crème pour une silhouette moderne. La douche remplace une porte coulissante au cadre doré par une enceinte en verre à double tête entièrement sans cadre avec banc de quartz intégré et sol en mosaïque de marbre tressé. La zone de vanité double utilise une double vasque en bois massif blanc à panneaux français avec un plafond à caissons voûté, une quincaillerie hexagonale en or champagne et des appliques murales en laiton vintage pour des tons chauds aux chandelles. Un miroir de toilette séparé en forme d'arc en or champagne avec des appliques en laiton encadre l'entrée - un miroir rituel final avant de sortir. Le résultat est le genre de salle de bains qui transforme un bain quotidien en vacances dans un manoir européen, avec vue sur le jardin et la piscine à travers les volets de la plantation d'origine.

$36,000 - $40,0004-6 semaines
  • Carrelage mural en marbre crème (du sol au plafond)
  • Plancher de douche en mosaïque de marbre Basketweave
  • Cabine de douche en verre pour deux personnes sans cadre
  • Ensemble Champagne Gold Rain + Handheld + Slide-Bar
  • Banc de douche en quartz intégré
Voir le projet complet

Foire aux questions sur Rénovation de salle de bain dans Vancouver

Absolument. Nous traitons toutes les demandes de permis pour les projets de rénovation de Vancouver, y compris les permis d'électricité, de plomberie et de structure. Notre équipe est expérimentée avec les codes du bâtiment de la ville de Vancouver, les réglementations en matière de patrimoine et les exigences en matière de strates. Nous gérons l’ensemble du processus d’autorisation afin que vous puissiez vous concentrer sur le choix de vos finitions tout en garantissant leur totale conformité.

Le calendrier dépend de la portée du projet : une rénovation de salle de bain prend 2 à 4 semaines, une rénovation de cuisine 3 à 6 semaines et un sous-sol complet 6 à 10 semaines. Les rénovations de condos peuvent prendre un peu plus de temps en raison des heures de construction imposées par les strates (généralement de 8 h à 17 h en semaine). Nous fournissons un calendrier de projet détaillé avant le début des travaux.

Oui. De nombreuses maisons de Vancouver, notamment à Kitsilano, Mount Pleasant et Dunbar, ont des murs en plâtre et une charpente plus ancienne. Notre équipe possède une vaste expérience des maisons d'avant-guerre et du milieu du siècle, y compris une démonstration appropriée des lattes et du plâtre, une évaluation structurelle et une finition moderne tout en respectant le caractère d'origine.

Absolument. Nous travaillons régulièrement dans le cadre de règlements de strates partout à Vancouver, des tours de Coal Harbour aux immeubles sans ascenseur de Fairview. Nous traitons les demandes d'approbation des strates, coordonnons l'accès aux bâtiments et les réservations d'ascenseurs, respectons les heures calmes et gérons le confinement du bruit et de la poussière. Nous disposons d'une assurance responsabilité civile de 5 millions de dollars dont la plupart des strates ont besoin.

Bathroom renovation costs in Vancouver range from $8,000–$20,000 for a powder room (2-piece) depending on finish level, to $10,000–$25,000 for a standard 3-piece bathroom. A full 4-piece renovation with new tub or walk-in shower, vanity, and tile runs $18,000–$35,000. Primary ensuites with curbless shower, heated floors, and premium fixtures typically run $35,000–$60,000+. Vancouver condo bathroom renovations require strata council approval before permit submission — most stratas take 2–4 weeks to approve a complete package. Older character homes may have cast-iron drain stacks that add $2,000–$5,000 for plumbing relocation if moving fixtures. Free written quotes available.

A bathroom renovation in Vancouver typically takes 2–4 weeks for a standard 4-piece scope. Ensuite renovations with curbless showers, heated floors, and premium tile layouts take 4–7 weeks. City of Vancouver permits for bathroom renovations with plumbing changes typically process in 1–2 weeks. Condo renovations in Vancouver high-rises take 10–20% longer due to strata-mandated construction hours (typically 9am–5pm weekdays), elevator freight bookings, and dust containment requirements. Heritage character homes in Strathcona and Grandview-Woodland may have cast-iron drain stacks that add time for rough-in relocation. A detailed week-by-week schedule is provided before work begins.

Basement renovation costs in Vancouver range from $30,000–$55,000 for basic finishing (no bathroom) — framing, insulation, drywall, LVP flooring, and pot lights. A mid-range renovation with a full bathroom addition runs $55,000–$90,000. A legal secondary suite with separate entrance, kitchen, bathroom, fire separation, and egress windows typically costs $85,000–$150,000 in the City of Vancouver. Vancouver's high real estate values make legal suite conversions one of the strongest investment options available — rental income from a completed one-bedroom suite helps offset mortgage costs. City of Vancouver permits for basement work with plumbing and electrical changes process in 2–4 weeks.

Basement renovation timelines in Vancouver depend on scope. Basic finishing without a bathroom runs 4–6 weeks of active construction. A mid-range renovation with a full bathroom addition takes 6–10 weeks. A legal secondary suite — requiring separate entrance, full kitchen, bathroom, egress windows, and fire separation — takes 10–16 weeks of construction, plus permit processing time. City of Vancouver permits for basement renovations involving plumbing and electrical changes are required and add 2–4 weeks of processing. Luxury custom basement projects run 12–20 weeks. Adding all phases together, plan for 4–6 months from contract signing to project completion for a legal suite in the City of Vancouver.

Vancouver City requires the suite to be no more than 40% of the gross floor area and mandates a separate entrance, full kitchen, and bathroom. Building permits run approximately 2% of construction value plus a development application fee (~$500), totalling roughly $2,000–$5,000. The renovation costs $65,000–$95,000 for unfinished space (8–10 weeks) or $45,000–$70,000 converting a finished basement (6–8 weeks). A cosmetic refresh of an existing suite starts at $20,000–$35,000. Reno Stars has extensive Vancouver basement suite experience and offers free on-site quotes.

In Vancouver's 2026 market, the three highest-ROI pre-sale projects are kitchen refreshes (paint, hardware, countertops -- cost $8,000-$15,000, adds $20,000-$40,000), bathroom modernization (cost $6,000-$12,000, adds $15,000-$25,000), and fresh interior paint (cost $3,000-$6,000, adds $8,000-$18,000, delivering 200-400% ROI). Full gut renovations rarely outperform targeted cosmetic updates before a sale. The golden rule: fix what buyers use as a negotiating chip, and upgrade what they will emotionally connect with. Basement suite legalization is worth considering if your property has potential -- it can add $40,000-$80,000 in perceived value.

Choosing the right renovation contractor in Vancouver starts with verifying BC licensing. All contractors performing work over $1,000 must be registered with Consumer Protection BC. They should carry general liability insurance of at least $2 million per occurrence and WorkSafeBC coverage for all workers on your project — if an uninsured worker is injured on your property, you as the homeowner may be liable. Get at least 3 written quotes and compare them carefully: a lower quote often excludes permits, demolition, or disposal. Ask for references from 3-5 recent projects similar to yours in scope and location. Did the project finish on time and on budget? Were there surprise charges? Would they hire the contractor again? A real project portfolio with actual completed photos is a strong signal of credibility.

La plupart des rénovations de salle de bains à Vancouver prennent de 2 à 4 semaines. Une simple mise à jour esthétique peut prendre 1 semaine, tandis qu'une rénovation complète avec des changements de disposition peut prendre 4 à 6 semaines.

Généralement non, mais nous travaillons efficacement pour minimiser les perturbations. Si vous disposez de plusieurs salles de bains, nous pouvons vous aider à planifier le calendrier de rénovation.

Nous utilisons des systèmes d'étanchéité de pointe, notamment Schluter et RedGard, pour garantir que votre salle de bain est correctement protégée contre les dommages causés par l'humidité.

Prêt à démarrer votre projet Rénovation de salle de bain dans Vancouver ?

Laissez-nous transformer votre vision en réalité grâce aux années d'expérience de 20.