
Burnaby Renovation Cost Guide 2026: Real Project Prices
Reno Stars Team
What does a renovation actually cost in Burnaby? Real pricing from 8 completed Reno Stars projects across kitchens, bathrooms, and whole-house renos. Updated 2026.
# Burnaby Renovation Cost Guide 2026: Real Project Prices
If you're planning a renovation in Burnaby, the most useful number isn't an industry average — it's what your neighbours actually paid. This guide breaks down real pricing from 8 completed Reno Stars projects across Burnaby townhouses, single-family homes, and commercial spaces, all completed within the last 18 months.
## What does a renovation cost in Burnaby?
Burnaby renovation costs fall into three brackets, depending on scope:
| Project type | Budget range | Typical timeline |
|---|---|---|
| Bathroom renovation | $20,000 – $32,000 | 3 – 6 weeks |
| Kitchen renovation | $20,000 – $40,000 | 5 – 8 weeks |
| Two-bathroom renovation | $26,000 – $30,000 | 5 – 7 weeks |
| Commercial fit-out | $23,000 – $25,000 | 4 – 6 weeks |
These numbers come from real Reno Stars projects in Burnaby — not industry surveys or estimator tools. Every line includes labour, materials, permits, garbage removal, and a 3-year workmanship warranty.
## Real Burnaby projects: what we built and what it cost
### Custom Kitchen Renovation with Wood Veins Cabinets — $30,000 – $35,000
A Burnaby townhouse kitchen transformed with wood-grain cabinets, a contrasting island, and quartz countertops. Smart layout planning maximized every square foot, and updated lighting completely changed the feel of the space. Full project link in our [Burnaby kitchen projects collection](/projects/kitchen-renovation).
### Custom Kitchen Renovation with Gold Fixtures — $35,000 – $40,000
A higher-end Burnaby kitchen renovation with custom cabinets and gold hardware accents. The owner wanted a unique look that still functioned for a busy family. We coordinated cabinet manufacturing, plumbing, electrical, and tile work in a 6-week timeline.
### Luxury Bathroom Renovation with Custom Features — $28,000 – $32,000
A Burnaby home's master bathroom redone with custom tile work, a frameless glass shower, and integrated lighting. The luxury bracket in Burnaby usually means custom glass + premium fixtures + niche lighting — every one of those adds $1,000-$2,000.
### Two Bathroom Renovation with Custom Features in Burnaby — $26,000 – $30,000
Two bathrooms tackled in parallel for a Burnaby family. Doing both at once cuts ~15% off the combined cost vs sequential renovations because demolition, plumbing, and tile crews work back-to-back instead of mobilizing twice.
### Bathroom Renovation with Custom Features (Burnaby townhouse) — $20,000 – $25,000
A more modest Burnaby townhouse bathroom with prefab vanity, glass door, and tile-to-ceiling shower walls. The lower bracket typically uses prefab cabinetry and standard finishes — still high quality, just not custom.
### Toy Store Renovation in Metrotown — $23,000 – $25,000
A Metrotown commercial fit-out for a retail toy store: custom display walls, lighting, vinyl flooring, and brand-aligned colour palette. Burnaby commercial work requires city permits and after-hours work to avoid disrupting the mall.
### Family Townhouse Kitchen Renovation
White shaker cabinets, quartz countertops, and a new island in a busy family townhouse. The layout was the constraint — Burnaby townhouse kitchens are typically narrow and need careful planning to add an island without blocking traffic flow.
### Two Bathroom Renovation for Family
Two more Burnaby bathrooms in one project. This kind of multi-bathroom scope is common in Burnaby townhouses where the second bathroom is usually overdue for an update.
## What drives Burnaby renovation cost up or down?
**Up:**
- Custom cabinets vs prefab (+30-40%)
- Custom glass shower doors vs prefab tempered (+$1,500)
- Mitered niche edges vs metal trim (+$300)
- Hydronic baseboard heater relocation (Burnaby has many homes with hydronic heat)
- Permit complexity for structural changes
- Older Burnaby homes (pre-1980) often have surprises behind the walls — knob-and-tube wiring, asbestos insulation, lead paint
**Down:**
- Doing multiple rooms in one project (cuts 10-15% on shared trades)
- Choosing prefab cabinets and standard tile sizes
- Keeping the existing layout (no plumbing relocation)
- Booking in our slower months (October–February typically)
## Why Burnaby permits matter
Burnaby's building department is stricter than some neighbouring cities. Renovations that touch electrical, plumbing, or structural elements need permits, and inspections happen at multiple stages (rough-in, insulation, final). We handle permit pulls in-house — most homeowners are surprised how much paperwork is involved for a "simple" bathroom update.
For renovations in Burnaby townhouses specifically, you may also need strata council approval before applying for the city permit. Lead times for strata approval vary from 2 to 8 weeks depending on the council's meeting schedule.
## Burnaby neighbourhoods we serve
We work across Burnaby — Metrotown, Brentwood, Lougheed, Capitol Hill, Burnaby Heights, Edmonds, Big Bend, Sussex, Richmond Park, Forest Glen, Buckingham Heights, and Government Road. Most projects are within a 20-minute drive of our Richmond shop, which keeps mobilization costs low.
## How to get an accurate Burnaby renovation quote
The numbers in this guide are starting points. For an accurate quote on your specific Burnaby project:
1. Book a free 30-minute site visit
2. We measure, photograph, and discuss your goals
3. You receive a detailed line-item quote within 48 hours, broken down by trade
4. Quotes are valid for 30 days and include allowances for materials you select after signing
[Get a free Burnaby renovation quote →](/contact)
We also publish a [bathroom-specific Vancouver cost guide](/guides/bathroom-renovation-cost-vancouver/) with the same level of project-by-project detail if your scope is bathroom-only.
## Frequently asked questions
**How long does a typical Burnaby renovation take?**
Bathrooms are 3-6 weeks, kitchens 5-8 weeks, two-bathroom projects 5-7 weeks. Whole-house renovations take 3-6 months depending on scope.
**Do you handle the permits?**
Yes. Permit applications, drawings, and inspections are part of every quote. We coordinate directly with the City of Burnaby building department.
**What's your warranty?**
3 years on workmanship for personal-use residential properties. 1 year on rental, strata, or commercial properties. Plumbing and electrical warranties match the trade-specific industry standards.
**Can you start right away?**
Lead time depends on the season. Summer is our busiest period (4-8 weeks out). October-February typically has 2-3 week lead time.
