Whole House Renovation

Whole House Renovation

Whole-house renovation under one contract — one project manager, all trades coordinated, milestone payments. Vancouver Metro 2026: $150K–$800K typical, luxury or major structural changes $1M+.

Top-rated Whole House Renovation in Vancouver· 5.0★ from 76 Google reviews

Vancouver whole-house renovation — full-scope rebuild from inside-the-walls to surface finishes, all trades coordinated under one contract with one project manager. We work in single-family homes, townhouses, and large condos across Metro Vancouver, including heritage and character homes.

Every whole-house project includes a written scope, milestone-based contract, BC Building Code permit package, structural engineer coordination where needed, $5M CGL insurance, WorkSafeBC, and our 3-year workmanship warranty.

Real Vancouver Whole-House Costs (2026)

Tier Scope Total Investment
Cosmetic refresh (small home <1,800 sqft) Paint, flooring, lighting, kitchen + bathroom mid-range refresh, no structural changes $150,000 – $250,000
Mid-range full reno (2,000–3,000 sqft) Full kitchen + 2–3 bathrooms gut, flooring throughout, all paint, lighting, electrical updates, basic basement finishing $250,000 – $500,000
Premium full reno (3,000–4,500 sqft + structural changes) All above + load-bearing wall removal, layout reconfiguration, premium finishes, custom millwork, smart-home wiring $500,000 – $900,000
Luxury (4,500+ sqft, additions, designer specification) All above + addition or major structural work, designer-specified finishes, integrated home automation, landscape integration $900,000 – $1,500,000
Ultra-luxury / heritage restoration Period-correct restoration with modern systems, specialist trades, custom-fabricated components $1,500,000 – $3,000,000+

What's Included

1. Pre-construction

  • Existing-conditions survey + measurements
  • Structural assessment (engineer when load-bearing or addition)
  • BC Building Code review + permit package
  • Heritage Alteration Permit (where applicable, City of Vancouver Heritage Conservation Areas)
  • Schedule of Quantities + fixed-price contract
  • 3D walkthrough (premium tier)

2. All Trades Under One Contract

  • Demolition + asbestos abatement
  • Structural carpentry + framing changes
  • Electrical (200A panel upgrade typical)
  • Plumbing (PEX-A re-pipe typical, gas line work)
  • HVAC (heat pump install or full duct rework)
  • Insulation upgrade (Vancouver homes often pre-2000 R-12 — bring to R-22 minimum)
  • Drywall, paint, finish carpentry
  • Flooring (hardwood, tile, LVP)
  • Cabinetry + countertops + tile
  • Roofing (when included in scope)
  • Windows + exterior doors

3. What Drives Price Up

  • Asbestos abatement in pre-1990 home: +$8K–$40K depending on extent
  • Knob-and-tube wiring replacement (pre-1950 homes): +$15K–$35K
  • Galvanized supply lines / lead pipe replacement: +$8K–$25K
  • 200A panel upgrade + service entrance: +$5K–$10K
  • Roof replacement when added to scope: +$15K–$35K
  • Foundation crack repair / underpinning: +$10K–$80K
  • Heritage / character preservation requirements: +15–30% on the relevant scope
  • City of Vancouver permit fees (whole-house scope): $5K–$15K
  • Engineer + architect (premium / structural scope): $15K–$50K

4. Timeline

Scope Duration
Cosmetic refresh 3–6 months
Mid-range full reno 6–10 months
Premium with structural 10–14 months
Luxury / addition 14–24 months

5. Why Our Floor is $150K and Not $50K

A "$50K Vancouver whole-house renovation" is mathematically impossible in 2026 once you include:

  • BC permit + inspection: $4K–$12K
  • Asbestos test (required pre-1990) + abatement: $5K–$30K
  • 200A panel upgrade (most older homes need this): $5K–$10K
  • Even a single bathroom + kitchen refresh: $40K–$70K

Anyone quoting under $150K for "whole house" is either limiting scope to a single room, hiding extras in change orders, or not pulling permits.

6. What's Always Included

  • Written milestone-based contract (not lump-sum cash)
  • BC Building Code permit package (we file, you pay City fees direct)
  • Structural engineer coordination
  • $5M CGL + WorkSafeBC
  • 3-year workmanship warranty
  • Daily site cleanup, weekly photo documentation
  • Single project manager (one phone number, one email)
  • Itemized invoices for tax / insurance

7. Free In-Home Consultation

Whole-house projects start with a 2-hour walkthrough — full home survey, scope discussion, ballpark range, and (if you proceed) a fixed-price written contract within 14 days. Free, no obligation.

What We Do

Full Interior RenovationOpen Concept LayoutStructural ModificationsKitchen & Bathroom PackageFlooring ThroughoutPainting & TrimElectrical UpgradesPlumbing UpdatesDrywall & FinishingPre-Sale Renovation

Why Us

Free consultation and quote
Licensed and fully insured (CGL + WCB)
$5M CGL insurance, active WCB coverage, up to 3 years warranty
20+ years experience
5-star Google rating
700+ projects completed

Frequently Asked Questions

Can I live in my home during a whole house renovation in Vancouver?+

It depends on the scope. For major renovations in Vancouver, we often recommend temporary relocation for safety and efficiency. We can help coordinate phased work if staying is preferred.

How do you manage a whole house renovation project?+

We assign a dedicated project manager who coordinates all trades, maintains the schedule, and provides regular updates. You have a single point of contact throughout.

Do I need permits for a whole house renovation in Vancouver?+

Yes, whole house renovations typically require multiple permits for structural, electrical, and plumbing work. We handle all Vancouver permit applications and inspections.