Skip to main content
Kitchen Renovation

Kitchen Renovation

Full kitchen renovation — design, custom cabinetry, countertops, tile, lighting, appliances. One team, one contract. Vancouver Metro 2026: typical investment $25K–$150K (luxury builds $200K+).

Top-rated Kitchen Renovation in Vancouver· 5.0★ from 76 Google reviews

Vancouver kitchen renovations — full-service design, demolition, cabinetry, countertops, tile, plumbing, electrical, lighting, and appliance install under one contract. We work in single-family homes, townhouses, condos, and laneway suites across Metro Vancouver.

Every kitchen reno includes a written scope, fixed-price contract, BC Building Code permit handling where applicable, $5M CGL insurance, WorkSafeBC coverage, and our 3-year workmanship warranty.

What's Included

1. Design & Planning

Item Detail
In-home consultation + measurements Free, ~90 min
3D rendering / floor plan 2–3 design iterations included
Cabinet layout + appliance specification Engineered for ergonomics + clearances
Permit drawings (when required) Layout changes, gas line moves, electrical upgrades
Material + finish selection Showroom visit + guided selection

2. Demolition & Prep

  • Selective demo (preserve good elements) or full gut
  • Asbestos / lead-paint testing in pre-1990 homes (BC code requirement)
  • Dust containment (ZipWall + HEPA filtration)
  • Daily site cleanup, weekly debris haul

3. Cabinetry

Tier Price/lin. ft (2026) What you get
Stock / IKEA-grade with custom doors $300–$500 Solid box, particleboard, hinge upgrade
Semi-custom (Canadian-built) $500–$900 Plywood box, soft-close, more sizes
Custom (local cabinetmaker) $900–$1,800 Any size/finish, full-wood, premium hardware
Luxury (specialty veneer, integrated lighting) $1,800–$3,500+ Designer specification, integrated appliances

4. Countertops

Material Installed price/sq ft (2026) Notes
Laminate $40–$70 Budget; new printed laminates look upscale
Quartz (mid-range) $90–$140 Caesarstone, Silestone — most popular choice
Quartz (premium) $140–$200 Calacatta-look, large slab, polished edge
Granite $80–$160 Variable — depends on slab origin
Marble $130–$280 Cararra, Statuario — needs sealing
Quartzite / Dekton / Neolith $180–$400+ Luxury, heat-resistant, large-format

5. Real Vancouver Kitchen Costs (2026)

Tier Total Investment What it includes
Refresh (small / cosmetic) $25,000 – $40,000 Paint, hardware swap, new countertop + sink, no layout change. Existing cabinets retained.
Mid-range full reno (10–14 lin. ft. cabinets) $40,000 – $80,000 Semi-custom cabinets, quartz counter, new tile backsplash, undermount sink, all-new mid-tier appliances, lighting upgrade
Premium reno (15–22 lin. ft., layout change) $80,000 – $150,000 Custom cabinets, premium quartz, gas line move, structural wall removal, large island, premium appliance package, custom millwork
Luxury (open-concept, designer brands) $150,000 – $300,000+ Designer kitchens, integrated Sub-Zero/Wolf/Miele appliances, custom millwork, butler's pantry, library wall, smart-home integration

6. What Drives Price Up

  • Layout change — moving sink or stove (plumbing/gas reroute): +$3K–$10K
  • Structural wall removal — engineer sign-off + LVL beam: +$8K–$25K
  • Gas line work — adding island gas range: +$2K–$5K
  • 200A panel upgrade — for induction/electric: +$4K–$8K
  • Hardwood under cabinet area — when extending kitchen footprint: +$3K–$8K
  • Custom range hood ducting — exterior penetration through brick: +$2K–$6K
  • Strata building (condos/townhouses) — limited hours, freight elevator booking, building protection: +$3K–$8K
  • Asbestos abatement (pre-1990 homes): +$2K–$15K depending on extent

7. Timeline

Scope Duration
Refresh (cosmetic) 2–4 weeks
Mid-range full reno 6–10 weeks
Premium with layout change 10–16 weeks
Luxury 16–28 weeks

8. What's Always Included (Every Reno)

  • Written scope + fixed-price contract
  • BC permit handling where required
  • $5M Commercial General Liability insurance
  • WorkSafeBC clearance letter
  • 3-year workmanship warranty (industry-leading — most contractors offer 1)
  • Pressure test on plumbing, leak test on gas
  • Final cleanup + walkthrough
  • Itemized invoice (insurer-ready)

9. Free In-Home Quote

Every kitchen project starts with an in-home assessment — measurements, photo documentation, scope discussion, and a written estimate with material allowances. Free, takes about an hour, no obligation.

Why our floor is $25K and not $14K: Anyone quoting a "Vancouver kitchen reno from $14K" is either (a) an unlicensed contractor without WorkSafeBC, (b) hiding cost in change orders, or (c) using particleboard cabinets that fail in 5 years. $25K is what an honest mid-grade refresh actually costs in Vancouver in 2026 once you include permits, insurance, code-grade plumbing/electrical, and warranty.

What We Do

Custom CabinetsQuartz CountertopsKitchen IslandBacksplash TilingUnder-Cabinet LightingPlumbing RelocationCabinet PaintingFlooring InstallationAppliance InstallationOpen Concept Conversion

Why Us

Free consultation and quote
Licensed and fully insured (CGL + WCB)
$5M CGL insurance, active WCB coverage, up to 3 years warranty
20+ years experience
5-star Google rating
700+ projects completed

Frequently Asked Questions

How long does a kitchen renovation typically take?+

A typical kitchen renovation takes 4-8 weeks depending on the scope. Simple updates like cabinet refacing may take 1-2 weeks, while complete gut renovations with custom cabinetry can take 8-12 weeks.

What is the average cost of a kitchen renovation in Vancouver?+

Kitchen renovations in Vancouver typically range from $15,000 to $75,000+ depending on size and finishes. We provide free detailed quotes after an in-home consultation.

Do I need permits for my kitchen renovation?+

Permits are required for electrical, plumbing, and structural changes. We handle all permit applications and ensure your renovation meets Vancouver building codes.

Get a Quote for Kitchen Renovation

Let us transform your vision into reality with 20 years of experience.