Skip to main content
Bathroom Renovation in West Vancouver
West Vancouver

Bathroom Renovation in West Vancouver

Luxury kitchen and bathroom renovations in West Vancouver, designed for upscale waterfront and hillside homes.

About Bathroom Renovation in West Vancouver

Vancouver bathroom renovations — design, demolition, waterproofing, tile, plumbing, electrical, lighting, custom fixtures and finishes. Powder rooms to full master ensuites. We work in single-family homes, condos, townhouses, and laneway suites across Metro Vancouver.

Every bathroom reno includes a written scope, fixed-price contract, permit handling where required, BC Code §3.7 wet-room compliance, $5M CGL insurance, and our 3-year workmanship warranty.

What's Included

1. Design & Planning

  • In-home assessment (free, ~60 min)
  • 3D rendering / fixture layout
  • Tile + finish selection (showroom visit included)
  • Plumbing/electrical scope (relocated drains require BC permit)

2. Demolition + Waterproofing

  • Selective demo or full gut
  • Asbestos testing in pre-1990 homes
  • Schluter-Kerdi or Wedi waterproofing membrane (industry standard, not just RedGard liquid)
  • Pre-slope mortar bed under linear drain
  • Pressure test on rough-in plumbing before tile

3. Real Vancouver Bathroom Costs (2026)

Type Total Investment What it includes
Powder room refresh $12,000 – $20,000 Vanity replace, toilet upgrade, paint, lighting, mirror, fan upgrade
Powder room full reno $18,000 – $30,000 Above + new flooring tile, drywall repair, electrical relocate
Standard 4–5 piece refresh $20,000 – $35,000 Tub reglaze or surround swap, vanity replace, new toilet, paint, lighting, fan
Full bathroom gut + tile $35,000 – $60,000 Schluter waterproof, custom tiled shower with niche, new vanity + countertop, premium fixtures, new tile flooring
Master ensuite (premium) $60,000 – $100,000 Above + double vanity, soaker tub, walk-in shower with bench, heated floors, towel warmer, custom millwork
Luxury / spa ensuite $100,000 – $200,000+ Steam shower, smart fixtures, custom built-ins, designer tile, programmable lighting, sound system, sauna integration

4. Premium Fixtures & Finishes (typical specs)

Item Mid-range Premium
Toilet Toto Drake $400 Toto Washlet smart toilet $4,000
Vanity faucet Moen $250 Brizo / Kohler $700–$1,500
Shower system Moen Magnetix $400 Hansgrohe RainDance $1,800
Tub Standard alcove $1,200 Freestanding soaker $3,500–$8,000
Vanity Stock 36" $800 Custom millwork 60" $4,000–$9,000
Tile (per sq ft installed) Porcelain $18–$28 Marble / large-format $40–$80
Lighting Recessed + sconce $400 Designer chandelier + LED strip $2,000+

5. What Drives Price Up

  • Layout change — moving toilet/shower (drain relocate, vent rework): +$3K–$8K
  • Structural changes — tub-to-shower conversion with curbless, framing changes: +$4K–$10K
  • Heated floors — electric mat under tile: +$1.5K–$4K (worth every dollar in Vancouver winters)
  • Smart toilet (bidet) rough-in — extra electrical + cold supply: +$800–$1,500
  • Steam shower — generator, vapor-proof glass, controls: +$8K–$18K
  • Custom millwork vanity vs stock: +$2K–$6K
  • Marble / large-format tile (installer-specific skill premium): +$3K–$8K
  • Strata building (condos) — work-hour restrictions, building protection: +$2K–$5K

6. Timeline

Scope Duration
Powder refresh 1–2 weeks
Powder full reno 2–3 weeks
Standard refresh 3–4 weeks
Full gut + tile 4–7 weeks
Premium ensuite 7–10 weeks
Luxury / spa 10–16 weeks

7. What's Always Included

  • Written scope + fixed-price contract
  • BC Code §3.7 wet-room compliance
  • Schluter-Kerdi waterproofing membrane (industry-standard)
  • Pre-tile pressure + leak test
  • $5M CGL + WorkSafeBC
  • 3-year workmanship warranty
  • Final clean + walkthrough

8. Free In-Home Quote

Every bathroom project starts with an in-home assessment — measurements, plumbing-route check, photo documentation, and a written estimate with allowances. Free, takes ~60 min, no obligation.

Why our floor is $20K and not $12K: A $12K bathroom in Vancouver 2026 either skips proper waterproofing (Schluter/Wedi membrane is $1,200 in materials alone for a full bath), uses big-box-only fixtures that don't carry warranty, or is done by an unlicensed installer without BC permit. $20K is what a code-compliant Vancouver bathroom actually costs once you include licensed plumber + electrician + tile setter + warranty.

Read more: Vancouver bathroom renovation cost guide

Bathroom Renovation Services in West Vancouver

Reno Stars provides premium renovation services throughout West Vancouver — from the waterfront estates of Dundarave and Ambleside to the hillside homes of British Properties, Caulfeild, and Cypress Park. West Vancouver is home to some of Metro Vancouver's most distinctive and valuable properties, and our team brings the precision, craftsmanship, and attention to detail that high-end renovations demand.

Luxury bathroom renovations are our signature West Vancouver service. We specialize in spa-inspired designs featuring heated porcelain tile floors, curbless showers with linear drains, freestanding soaker tubs, custom vanities with integrated LED mirrors, and premium fixtures from brands like Kohler, Grohe, and Hansgrohe. Our West Vancouver bathroom projects range from $35,000 for a guest bath refresh to $60,000+ for a master ensuite transformation — as demonstrated by our recent project converting one bathroom into two elegant spaces.

Kitchen renovations in West Vancouver often involve opening up floor plans to capture ocean and mountain views. We regularly remove or modify load-bearing walls (with engineer-stamped designs), install floor-to-ceiling windows, and create dramatic open-concept kitchens with waterfall islands, integrated appliance columns, and custom cabinetry in premium finishes. Our West Vancouver kitchen projects typically range from $29,000 to $75,000 depending on scope and materials.

The District of West Vancouver's building department has specific requirements for hillside construction, drainage management, and tree preservation that affect renovation projects. We are familiar with the permit process and maintain strong relationships with local inspectors. For properties in the British Properties or other areas with restrictive covenants, we ensure all renovations comply with both municipal requirements and community guidelines.

West Vancouver's older homes — many built in the 1960s–70s as modernist masterpieces by architects like Arthur Erickson and Ron Thom — present exciting restoration opportunities. We've refreshed mid-century modern homes with period-appropriate materials while adding contemporary comfort: updated insulation, new windows that match the original proportions, and modern mechanical systems hidden within the original design.

Our 3D rendering service helps West Vancouver homeowners visualize their renovation before construction begins. We create photorealistic renderings of kitchens, bathrooms, and living spaces so you can see exactly how materials and layouts will look in your home. Every project includes a 3-year workmanship warranty and a detailed written quote.

Related cost guides: [Kitchen renovation costs](/en/guides/kitchen-renovation-cost-vancouver/) | [Bathroom renovation costs](/en/guides/bathroom-renovation-cost-vancouver/) | [Whole-house renovation costs](/en/guides/whole-house-renovation-cost-vancouver/) | [Cabinet refinishing costs](/en/guides/cabinet-refinishing-cost-vancouver/)

Related: [Basement renovation costs](/en/guides/basement-renovation-cost-vancouver/)

Featured projects: [West Vancouver bathroom renovations 2026](/en/blog/bathroom-renovations-west-vancouver-2026/) | [Bathroom-to-two transformation: case study](/en/blog/west-vancouver-bathroom-renovation-case-study/) | [Commercial Renovation Costs Vancouver 2026](/en/guides/commercial-renovation-cost-vancouver/) | [Basement Suite Conversion Costs Vancouver 2026](/en/guides/basement-suite-cost-vancouver/) | [Low-budget condo renovation: West Vancouver](/en/blog/low-budget-condo-renovation-in-west-vancouver-case-study/)

See our [70+ verified five-star client reviews](/en/reviews/).

Ready to start your West Vancouver renovation? [Get a free quote →](/en/contact/)

See our [portfolio of West Vancouver renovation projects](/en/projects/) or browse our [renovation design gallery](/en/design/).

## District of West Vancouver Permit Costs (2026)

The District of West Vancouver calculates permit fees based on construction value. Residential renovation permits typically cost $400–$1,200 for projects in the $30,000–$80,000 value range. Hillside properties — which covers most of West Vancouver — may require a geotechnical engineer's assessment for any work affecting slopes, drainage, or retaining structures; budget $1,500–$3,500 for this review when applicable. Current permit processing times are 4–8 weeks for standard residential projects. Properties in covenant-controlled areas (British Properties, Cypress Park, Caulfeild) require covenant compliance review before permit issuance.

What We Do

Walk-In ShowerBathtub-to-Shower ConversionCustom VanityTile WorkFrameless Glass EnclosureLED MirrorsWaterproofingHeated FlooringCurbless ShowerAccessible Design

Why Choose Our West Vancouver Service

Premium craftsmanship for luxury properties
Natural stone, custom cabinetry & designer fixtures
Ambleside, Dundarave & British Properties experience
Discreet, professional service with minimal disruption
Detailed 3D renderings before construction begins

Frequently Asked Questions About Bathroom Renovation in West Vancouver

Yes, we provide detailed 3D renderings for West Vancouver renovation projects. Our design team creates photorealistic visualizations of your kitchen, bathroom, or living space so you can see exactly how the finished renovation will look before construction begins. This helps you make confident decisions on materials, colors, and layout. The 3D rendering service is included as part of our design consultation.

Bathroom renovations in West Vancouver range from $35,000 for a guest bath refresh to $60,000+ for a luxury master ensuite. Premium projects include heated floors, curbless showers, freestanding soaker tubs, custom vanities, and fixtures from brands like Kohler and Grohe. We recently completed a project converting one bathroom into two spaces for approximately $57,000–$60,000.

Yes, we have experience renovating mid-century modern homes and heritage properties in West Vancouver. These homes — many designed by architects like Arthur Erickson and Ron Thom — require careful attention to preserve their architectural character while adding modern comfort. We can update insulation, windows, and mechanical systems while respecting the original design intent.

Yes, we are experienced with the District of West Vancouver's specific requirements for hillside construction, including drainage management, tree preservation, and slope stability. We prepare all necessary permit documentation and work with geotechnical engineers when required. For properties in the British Properties with restrictive covenants, we ensure full compliance.

Many British Properties lots carry registered restrictive covenants governing building setbacks, height limits, and sometimes exterior materials and colours. These covenants primarily affect new construction and exterior modifications — interior renovations (kitchens, bathrooms, living spaces) are rarely restricted. Before any exterior modification, we recommend a title search to identify registered covenants. Our design team is experienced in covenant-compliant renovation scopes throughout West Vancouver.

West Vancouver renovation timelines run 10–15% longer than equivalent projects elsewhere in Metro Vancouver, due to longer permit processing times, hillside site logistics, and the higher complexity of custom and luxury work. A kitchen renovation typically takes 5–8 weeks; a primary bathroom renovation 4–7 weeks; a whole-house renovation 4–9 months depending on scope.

Yes. West Vancouver homes — from Ambleside to British Properties — often require premium materials, custom cabinetry, and attention to detail that matches the neighbourhood standard. We source high-quality stone, tile, and fixtures, and our project management ensures the renovation meets West Vancouver's elevated expectations.

Most bathroom renovations in West Vancouver take 2-4 weeks. A simple cosmetic update may take 1 week, while a complete renovation with layout changes can take 4-6 weeks.

Typically no, but we work efficiently to minimize disruption. If you have multiple bathrooms, we can help you plan around the renovation schedule.

We use industry-leading waterproofing systems including Schluter and RedGard to ensure your bathroom is properly protected against moisture damage.

Ready to Start Your Bathroom Renovation Project in West Vancouver?

Let us transform your vision into reality with 20 years of experience.