Skip to main content
Bathroom Renovation in Burnaby
Burnaby

Bathroom Renovation in Burnaby

Real Burnaby bathroom renovation costs, timelines and completed local projects — transparently.

Bathroom Renovation Cost Range — Metro Vancouver

General range from 18 completed bathroom renovation projects across Metro Vancouver — not Burnaby-specific

$14K – $60K
Price Range
$28K
Average
18
Metro Projects
3 yrs
Warranty

About Bathroom Renovation in Burnaby

Reno Stars provides bathroom renovation for homeowners across Burnaby and Metro Vancouver.

Vancouver bathroom renovations — design, demolition, waterproofing, tile, plumbing, electrical, lighting, custom fixtures and finishes. Powder rooms to full master ensuites. We work in single-family homes, condos, townhouses, and laneway suites across Metro Vancouver.

Bathroom Renovation in Burnaby

Burnaby bathroom renovation costs: $20,000–$32,000 from real completed Burnaby projects. A standard 5-piece master bathroom (double vanity, soaker tub, separate shower, toilet, heated floor) typically runs $28,000–$32,000. Single 3-piece refreshes (tiled shower, vanity, toilet) run $20,000–$25,000.

Burnaby has a significant strata townhouse and condo inventory — especially in Brentwood, Lougheed, and Metrotown. Strata bathroom renovations require council approval before plumbing or structural work begins. We've prepared approval packages for dozens of Burnaby strata projects and maintain a 100% approval rate.

See our Burnaby Bathroom Renovation Guide 2026 for tier-by-tier cost breakdowns and strata approval tips.

What We Do

Walk-In ShowerBathtub-to-Shower ConversionCustom VanityTile WorkFrameless Glass EnclosureLED MirrorsWaterproofingHeated FlooringCurbless ShowerAccessible Design

Why Choose Our Burnaby Service

Condo and townhouse renovation specialists
Full strata coordination — approvals, scheduling, cleanup
Real project costs: bathrooms $20K–$32K, kitchens $30K–$40K
Custom cabinetry, quartz countertops, modern fixtures
Serving Metrotown, Brentwood, Edmonds, Deer Lake & all Burnaby areas
3-year warranty, BC licensed & insured

Share this:

Frequently Asked Questions About Bathroom Renovation in Burnaby

Yes, we have extensive experience renovating high-rise condos throughout Burnaby, including towers in Metrotown, Brentwood, and Edmonds. We work within strata bylaws and coordinate material deliveries, noise-hour restrictions, and elevator bookings. Our project managers handle all strata communication — renovation request letters, WCB confirmation, and $5M CGL insurance certificates — and submit complete packages to the strata council before work begins. Most Burnaby stratas require 2–4 weeks for approval. We schedule trades around mandated construction hours and protect common-area floors and elevator finishes throughout the project.

Basement renovations in Burnaby typically run $40,000–$120,000 depending on scope. A basic finish — drywall, flooring, lighting and a 3-piece bathroom — starts around $40,000–$60,000 and works well for newer Brentwood and Metrotown townhouses. Mid-range projects with a second bathroom and small kitchenette run $60,000–$95,000 — typical for legal suite conversions in The Heights and South Burnaby. High-end legal suites with separate entrance, full kitchen, and premium finishes can exceed $100,000. Sloped lots around Capitol Hill and Burnaby Mountain may require additional drainage and waterproofing work. All projects include permits, $5M CGL coverage, and a 3-year workmanship warranty.

Bathroom renovations in Burnaby range from $20,000–$25,000 for a standard update — new vanity, tile, fixtures, and lighting — to $28,000–$32,000 for a primary ensuite renovation with curbless shower, heated floors, and double vanity. Tub-to-shower conversions and upgraded tile packages run $25,000–$28,000. Large-format or luxury ensuite projects with frameless glass, stone tile, and premium fixtures reach $32,000–$45,000+. South Slope and Deer Lake single-family homes built 1960s–1980s often have original tile and fixtures at the full-replacement window. A City of Burnaby permit is required for any renovation involving plumbing or electrical changes. All prices include labour, materials, and permits.

Yes. We manage all strata coordination as part of our service for Burnaby condo and townhouse renovations. This includes preparing the renovation application package — detailed scope description, $5M CGL insurance certificate, WCB confirmation, and contractor trades list — scheduling work within strata-mandated construction hours (typically 8am–5pm or 9am–5pm weekdays), booking elevator freight access, and ensuring post-construction cleanup meets the strata's requirements. We've completed renovations in dozens of Burnaby strata buildings — including Metrotown towers, Brentwood Park condos, and Deer Lake townhouses — and understand the approval process for each building type and property management company.

Yes, we frequently renovate townhouses in Burnaby's major developments including Brentwood Park, Metrotown, Lougheed, Highgate Village, and Sullivan Heights. We coordinate with strata management on the required approval packages (scope of work, insurance certificates, noise management plan) and work within the building's permitted hours and access rules. Kitchen and bathroom renovations are our most common townhouse projects in these areas. For Burnaby townhouses with shared walls, we specify resilient-channel acoustic assemblies when requested to minimize noise transmission to neighbours during and after renovation.

A bathroom renovation in Burnaby typically takes 2–4 weeks for a standard 4-piece update — demolition, waterproofing, tile, vanity, fixtures, and final clean. Full ensuite renovations with curbless shower, heated floor, and custom tile take 4–6 weeks. Condo bathrooms in Metrotown and Brentwood may take slightly longer due to strata-mandated construction hours (typically 8am–5pm or 9am–5pm weekdays) and elevator booking requirements. City of Burnaby permits for bathroom renovations with plumbing changes typically process in 1–2 weeks — we submit at project kickoff. A detailed day-by-day schedule is provided before demo begins.

Yes — Reno Stars handles all permit applications for Burnaby kitchen, bathroom, and basement renovations. The City of Burnaby processes residential renovation permits through its Building Approvals Department online portal. Permits are required for any renovation involving plumbing changes, electrical circuit additions or upgrades, wall modifications, or layout changes. Permit not required for cabinet replacement, countertop swaps, tile, or appliance replacements with no electrical change. City of Burnaby 2026 permit fees: minor kitchen renovation $350–$700, kitchen with plumbing modification $500–$1,100, kitchen with structural changes $800–$1,800. Standard processing takes 2–3 weeks online; complex structural projects 4–6 weeks. We submit permit packages and track approvals on your behalf.

In Burnaby's competitive SkyTrain-connected market, the highest-ROI pre-sale projects are kitchen cabinet refreshes paired with quartz countertops and a ducted range hood upgrade — particularly important for the large Chinese-Canadian buyer community around Metrotown who prioritize proper kitchen ventilation. A strategic investment of $15,000-$50,000 in kitchen and bathroom updates typically generates $30,000-$120,000 in additional sale proceeds, depending on the neighbourhood. Pre-sale renovated homes in Burnaby's $900K-$1.8M range sell 18-26 days faster than unrenovated equivalents. Fresh neutral paint and updated flooring complete the package without requiring a full gut renovation.

Choosing the right renovation contractor in Burnaby starts with verifying BC licensing. All contractors performing work over $1,000 must be registered with Consumer Protection BC. They should carry general liability insurance of at least $2 million per occurrence and WorkSafeBC coverage for all workers on your project — if an uninsured worker is injured on your property, you as the homeowner may be liable. Get at least 3 written quotes and compare them carefully: a lower quote often excludes permits, demolition, or disposal. Ask for references from 3-5 recent projects similar to yours in scope and location. Did the project finish on time and on budget? Were there surprise charges? Would they hire the contractor again? A real project portfolio with actual completed photos is a strong signal of credibility.

Most bathroom renovations in Burnaby take 2-4 weeks. A simple cosmetic update may take 1 week, while a complete renovation with layout changes can take 4-6 weeks.

Typically no, but we work efficiently to minimize disruption. If you have multiple bathrooms, we can help you plan around the renovation schedule.

We use industry-leading waterproofing systems including Schluter and RedGard to ensure your bathroom is properly protected against moisture damage.

Ready to Start Your Bathroom Renovation Project in Burnaby?

Let us transform your vision into reality with 20 years of experience.