Bathtub Renovation Cost in Vancouver (2026): From Refinishing to Full Replacement

Reno Stars Team

What does a bathtub renovation cost in Vancouver? From refinishing (.5K) to full soaker tub installs (K+), get real pricing based on our completed Metro Vancouver projects — plus timelines and what to ask contractors.

If you're replacing a bathtub in Vancouver or the Lower Mainland — whether you're converting to a walk-in shower, upgrading to a soaker tub, or doing a full bathroom refresh — this guide gives you real cost data based on our completed projects.

Bathtub Renovation Cost in Vancouver: Quick Summary

Project Type Estimated Cost Timeline
Bathtub liner or refinishing ,500–,500 1 day
Tub-to-shower conversion (basic) ,000–,000 1–2 weeks
Full bathroom reno with new tub ,000–,000 3–5 weeks
Freestanding soaker tub install ,000–,000+ 4–6 weeks
Walk-in tub (accessibility) ,000–,000 2–3 weeks

Prices include labour and materials. Plumbing relocation, structural work, and permits are additional if required.

What Drives the Cost of a Bathtub Renovation?

1. The Scope of Work

A simple bathtub liner covers the existing tub surface and costs a fraction of a full replacement. A full renovation — removing the tub, waterproofing the walls, retiling, and upgrading plumbing — costs significantly more but adds lasting value.

Bathtub liner / refinishing: ,500–,500 Best for: Tubs in good structural shape with cosmetic wear. Covers chips, stains, and outdated colour. Not a permanent fix — liners typically last 10–15 years.

Tub-to-shower conversion: ,000–,000 Best for: Households that don't use the tub. Removes the tub, installs a curbless or low-curb shower with tile and glass. Adds accessibility and resale value.

Full bathroom renovation with tub replacement: ,000–,000 Replaces the tub and surrounds with new tile, plumbing fixtures, vanity, lighting, and flooring. This is the most common scope for older Vancouver homes.

Freestanding soaker tub installation: ,000–,000+ Requires a structural floor check (freestanding tubs filled with water can weigh 500–700 lbs), floor tile replacement, a floor-mounted tub filler, and often an updated electrical circuit.

2. Tub Type and Material

Tub Type Material Cost Notes
Alcove tub (standard) –,200 Most common, fits in 3-wall enclosure
Drop-in tub –,000 Installed in a deck or platform
Freestanding tub ,000–,000+ Acrylic to cast iron; floor space required
Walk-in tub ,000–,000 Accessibility-focused; requires specific plumbing
Soaker tub (deep) –,000 Deeper profile; floor load check recommended

3. Plumbing Changes

If you're moving the tub location or upgrading to a floor-mounted filler, plumbing costs increase significantly. Expect ,500–,000 for plumbing work depending on complexity.

4. Permits

In Vancouver and most Metro Vancouver municipalities, a building permit is required for any bathtub replacement that involves:

  • Moving or altering drain/supply lines
  • Structural changes to the floor

Permits typically cost – through City of Vancouver or your local municipality. Permit pulls are included in Reno Stars projects where required.

3-Piece vs 4-Piece Bathroom Renovation Cost

A common question we receive: what's the difference in cost between a 3-piece (toilet, sink, shower) and 4-piece (toilet, sink, tub, shower or combo)?

Bathroom Type Typical Cost Range Notes
3-piece (with shower, no tub) ,000–,000 Less tile, no tub surround
4-piece (with tub/shower combo) ,000–,000 Standard in most Vancouver homes
4-piece with separate shower + soaker ,000–,000+ Master ensuite style

Bathtub Renovation by City — Local Pricing Context

Vancouver: Projects average ,000–,000 due to higher labour costs and permit requirements for older homes.

Richmond: Comparable to Vancouver. Condo strata approval required for most units. Budget ,000–,000.

Burnaby: Strata-heavy market. Tub-to-shower conversions popular in smaller suites. Budget ,000–,000.

Surrey: More detached homes with older plumbing. Full replacements common. Budget ,000–,000.

North Vancouver: Older stock homes with cast iron tubs. Removal adds cost. Budget ,000–,000.

How Long Does a Bathtub Renovation Take?

Scope Timeline
Refinishing only 1 day (24h cure time before use)
Tub-to-shower conversion 7–14 days
Full 4-piece bathroom renovation 3–5 weeks
Master ensuite with custom tile + soaker tub 5–8 weeks

Timelines include permit review time where applicable (typically 2–4 weeks for a building permit in Metro Vancouver).

What to Ask Before Hiring a Bathtub Renovation Contractor

  1. Is the quote all-in? Ask if permits, disposal, and tile are included.
  2. Do they pull their own permits? In BC, the contractor of record must pull permits — if they ask you to pull your own, that's a red flag.
  3. Is waterproofing included? BC Building Code requires waterproofing in all wet areas. Ask for specifics (Schluter Kerdi, Redgard, etc.).
  4. What tub brands do they work with? Quality brands: Mirolin, American Standard, Kohler, MAAX, BainUltra.
  5. Do they have strata experience? If you're in a condo, they need to understand strata approval processes and insurance requirements.

Our Completed Bathtub Renovation Projects

We've completed bathtub renovations across Metro Vancouver, including:

  • Burnaby condo: Tub-to-shower conversion in a 600 sq ft suite — ,200 all-in, 2 weeks
  • Richmond townhouse: Full 4-piece bathroom renovation with soaker tub — ,500, 4 weeks
  • Vancouver house: Removed cast iron tub, installed custom tile shower and freestanding soaker — ,000, 6 weeks
  • Surrey detached home: Alcove tub replacement with subway tile surround — ,000, 3 weeks

See our full renovation portfolio for before-and-after photos.

Get a Free Bathtub Renovation Quote

Reno Stars is a licensed, insured Vancouver renovation contractor specializing in bathroom renovations across Metro Vancouver. We provide detailed, all-in quotes with no hidden fees.

Contact us for a free in-home estimate — we'll assess your bathroom, discuss your options, and give you a written quote within 48 hours. Call or text: 778-960-7999.

See also: Average Bathroom Renovation Cost in Vancouver | Bathroom Renovation Planning Guide | Burnaby Bathroom Renovation Guide