Skip to main content
New Westminster

Kitchen Renovation in New Westminster

Kitchen, bathroom, and condo renovation specialists serving New Westminster and the Quay area.

About Kitchen Renovation in New Westminster

Vancouver kitchen renovations — full-service design, demolition, cabinetry, countertops, tile, plumbing, electrical, lighting, and appliance install under one contract. We work in single-family homes, townhouses, condos, and laneway suites across Metro Vancouver.

Every kitchen reno includes a written scope, fixed-price contract, BC Building Code permit handling where applicable, $5M CGL insurance, WorkSafeBC coverage, and our 3-year workmanship warranty.

What's Included

1. Design & Planning

Item Detail
In-home consultation + measurements Free, ~90 min
3D rendering / floor plan 2–3 design iterations included
Cabinet layout + appliance specification Engineered for ergonomics + clearances
Permit drawings (when required) Layout changes, gas line moves, electrical upgrades
Material + finish selection Showroom visit + guided selection

2. Demolition & Prep

  • Selective demo (preserve good elements) or full gut
  • Asbestos / lead-paint testing in pre-1990 homes (BC code requirement)
  • Dust containment (ZipWall + HEPA filtration)
  • Daily site cleanup, weekly debris haul

3. Cabinetry

Tier Price/lin. ft (2026) What you get
Stock / IKEA-grade with custom doors $300–$500 Solid box, particleboard, hinge upgrade
Semi-custom (Canadian-built) $500–$900 Plywood box, soft-close, more sizes
Custom (local cabinetmaker) $900–$1,800 Any size/finish, full-wood, premium hardware
Luxury (specialty veneer, integrated lighting) $1,800–$3,500+ Designer specification, integrated appliances

4. Countertops

Material Installed price/sq ft (2026) Notes
Laminate $40–$70 Budget; new printed laminates look upscale
Quartz (mid-range) $90–$140 Caesarstone, Silestone — most popular choice
Quartz (premium) $140–$200 Calacatta-look, large slab, polished edge
Granite $80–$160 Variable — depends on slab origin
Marble $130–$280 Cararra, Statuario — needs sealing
Quartzite / Dekton / Neolith $180–$400+ Luxury, heat-resistant, large-format

5. Real Vancouver Kitchen Costs (2026)

Tier Total Investment What it includes
Refresh (small / cosmetic) $25,000 – $40,000 Paint, hardware swap, new countertop + sink, no layout change. Existing cabinets retained.
Mid-range full reno (10–14 lin. ft. cabinets) $40,000 – $80,000 Semi-custom cabinets, quartz counter, new tile backsplash, undermount sink, all-new mid-tier appliances, lighting upgrade
Premium reno (15–22 lin. ft., layout change) $80,000 – $150,000 Custom cabinets, premium quartz, gas line move, structural wall removal, large island, premium appliance package, custom millwork
Luxury (open-concept, designer brands) $150,000 – $300,000+ Designer kitchens, integrated Sub-Zero/Wolf/Miele appliances, custom millwork, butler's pantry, library wall, smart-home integration

6. What Drives Price Up

  • Layout change — moving sink or stove (plumbing/gas reroute): +$3K–$10K
  • Structural wall removal — engineer sign-off + LVL beam: +$8K–$25K
  • Gas line work — adding island gas range: +$2K–$5K
  • 200A panel upgrade — for induction/electric: +$4K–$8K
  • Hardwood under cabinet area — when extending kitchen footprint: +$3K–$8K
  • Custom range hood ducting — exterior penetration through brick: +$2K–$6K
  • Strata building (condos/townhouses) — limited hours, freight elevator booking, building protection: +$3K–$8K
  • Asbestos abatement (pre-1990 homes): +$2K–$15K depending on extent

7. Timeline

Scope Duration
Refresh (cosmetic) 2–4 weeks
Mid-range full reno 6–10 weeks
Premium with layout change 10–16 weeks
Luxury 16–28 weeks

8. What's Always Included (Every Reno)

  • Written scope + fixed-price contract
  • BC permit handling where required
  • $5M Commercial General Liability insurance
  • WorkSafeBC clearance letter
  • 3-year workmanship warranty (industry-leading — most contractors offer 1)
  • Pressure test on plumbing, leak test on gas
  • Final cleanup + walkthrough
  • Itemized invoice (insurer-ready)

9. Free In-Home Quote

Every kitchen project starts with an in-home assessment — measurements, photo documentation, scope discussion, and a written estimate with material allowances. Free, takes about an hour, no obligation.

Why our floor is $25K and not $14K: Anyone quoting a "Vancouver kitchen reno from $14K" is either (a) an unlicensed contractor without WorkSafeBC, (b) hiding cost in change orders, or (c) using particleboard cabinets that fail in 5 years. $25K is what an honest mid-grade refresh actually costs in Vancouver in 2026 once you include permits, insurance, code-grade plumbing/electrical, and warranty.

Kitchen Renovation Services in New Westminster

Reno Stars has been renovating homes throughout New Westminster — from the heritage houses of Queen's Park and Sapperton to the modern high-rises along the waterfront and Columbia Street corridor. As one of Metro Vancouver's oldest cities, New Westminster presents unique renovation challenges: many homes predate 1940 and may contain knob-and-tube wiring, asbestos insulation, cast-iron plumbing, and plaster-and-lathe walls.

Heritage home renovation is a specialty of our New Westminster work. Queen's Park alone contains over 100 heritage-designated homes, and we understand how to modernize kitchens and bathrooms while preserving period details like crown moulding, hardwood floors, pocket doors, and stained glass. For homes on the Heritage Register, we can work within the city's Heritage Conservation Area guidelines to ensure your renovation maintains the home's character while meeting modern building code requirements.

New Westminster's steeply sloped topography means many homes have daylight basements with excellent suite potential. We've converted numerous New Westminster basements into legal secondary suites — complete with separate entrances, full bathrooms, and kitchenettes — helping homeowners offset their mortgage with rental income of $1,400–$2,000/month.

Condo renovations in the Quay, Downtown, and Brow of the Hill are another major segment of our work. The Royal City has seen significant new development in recent years, but many older condo buildings (built 1990–2010) are now ready for interior updates. We handle strata approvals, work within restricted construction hours, and can coordinate elevator access for material delivery in high-rise buildings.

Our New Westminster project portfolio includes bathroom renovations from $15,000–$30,000, kitchen renovations from $20,000–$40,000, and basement suite conversions from $35,000–$60,000. Every project comes with a 3-year workmanship warranty and transparent written quotes. Free estimates available — call us or book online.

What We Do

Custom CabinetsQuartz CountertopsKitchen IslandBacksplash TilingUnder-Cabinet LightingPlumbing RelocationCabinet PaintingFlooring InstallationAppliance InstallationOpen Concept Conversion

Why Choose Our New Westminster Service

Heritage home renovation specialists
Experienced with older housing stock updates
Basement conversions and suite additions
Familiar with New Westminster building codes
Respectful restoration of character features

Frequently Asked Questions About Kitchen Renovation in New Westminster

Yes, we have extensive experience renovating older and heritage homes in New Westminster. We preserve original character features while updating kitchens, bathrooms, and living spaces to modern standards.

Kitchen renovations in New Westminster typically range from $20,000 to $40,000 depending on scope. A basic refresh with new countertops and cabinet doors starts around $20,000, while a full custom kitchen with island and premium appliances can reach $40,000+. We provide free written quotes with no hidden fees.

Yes, most renovations in New Westminster require a building permit — especially structural work, plumbing or electrical changes, and basement suite conversions. The City of New Westminster issues permits through their Building Division. We handle the entire permit application process on your behalf and coordinate all required inspections.

Yes, we regularly convert basements into legal secondary suites in New Westminster. The city allows secondary suites in most single-family zones. A typical conversion costs $35,000–$60,000 and includes separate entrance, full bathroom, kitchenette, and all code-required safety features. Rental income typically ranges from $1,400–$2,000/month.

A standard bathroom renovation in New Westminster takes 2–4 weeks from demolition to completion. More complex projects (tub-to-shower conversion, tile relayout, moving plumbing) may take 4–6 weeks. We provide a detailed timeline before work begins and keep you updated throughout the project.

A typical kitchen renovation takes 4-8 weeks depending on the scope. Simple updates like cabinet refacing may take 1-2 weeks, while complete gut renovations with custom cabinetry can take 8-12 weeks.

Kitchen renovations in New Westminster typically range from $15,000 to $75,000+ depending on size and finishes. We provide free detailed quotes after an in-home consultation.

Permits are required for electrical, plumbing, and structural changes. We handle all permit applications and ensure your renovation meets New Westminster building codes.

Ready to Start Your Kitchen Renovation Project in New Westminster?

Let us transform your vision into reality with 20 years of experience.