Skip to main content
Burnaby

Cabinet Refacing in Burnaby

Transparent cabinet refacing pricing, our build process and related Metro Vancouver projects.

About Cabinet Refacing in Burnaby

Reno Stars provides cabinet refacing for homeowners across Burnaby and Metro Vancouver.

Vancouver kitchen cabinet refacing, refinishing, and full custom replacement. The cheapest path to a refreshed kitchen — when your existing layout works and the boxes are sound, you can transform the kitchen for 30–60% of a full renovation cost.

What We Do

Cabinet Door ReplacementDrawer Front ReplacementHardware UpgradeSoft-Close HingesShaker Style DoorsHigh-Gloss FinishWood Grain DoorsCountertop UpgradeCabinet Resurfacing

Why Choose Our Burnaby Service

Condo and townhouse renovation specialists
Full strata coordination — approvals, scheduling, cleanup
Real project costs: bathrooms $20K–$32K, kitchens $30K–$40K
Custom cabinetry, quartz countertops, modern fixtures
Serving Metrotown, Brentwood, Edmonds, Deer Lake & all Burnaby areas
3-year warranty, BC licensed & insured

Share this:

We serve Burnaby and would love to take on your cabinet refacing — explore our related work above and get a free quote.

Frequently Asked Questions About Cabinet Refacing in Burnaby

Yes, we have extensive experience renovating high-rise condos throughout Burnaby, including towers in Metrotown, Brentwood, and Edmonds. We work within strata bylaws and coordinate material deliveries, noise-hour restrictions, and elevator bookings. Our project managers handle all strata communication — renovation request letters, WCB confirmation, and $5M CGL insurance certificates — and submit complete packages to the strata council before work begins. Most Burnaby stratas require 2–4 weeks for approval. We schedule trades around mandated construction hours and protect common-area floors and elevator finishes throughout the project.

A full kitchen renovation in Burnaby typically takes 4–6 weeks from demolition to final appliance connection. The critical path includes: City of Burnaby permit processing (typically 1–2 weeks for kitchen permits with electrical or plumbing changes), cabinet fabrication lead time (3–6 weeks for semi-custom, 6–10 weeks for full custom), and countertop templating and fabrication (1–2 weeks after cabinet installation). Ordering cabinet samples and finalizing material selections before permit submission keeps the schedule tight and avoids mid-project delays. Burnaby condo projects in Metrotown and Brentwood may take 1–2 weeks longer than SFH projects due to strata construction hour restrictions and elevator booking requirements.

Yes. We manage all strata coordination as part of our service for Burnaby condo and townhouse renovations. This includes preparing the renovation application package — detailed scope description, $5M CGL insurance certificate, WCB confirmation, and contractor trades list — scheduling work within strata-mandated construction hours (typically 8am–5pm or 9am–5pm weekdays), booking elevator freight access, and ensuring post-construction cleanup meets the strata's requirements. We've completed renovations in dozens of Burnaby strata buildings — including Metrotown towers, Brentwood Park condos, and Deer Lake townhouses — and understand the approval process for each building type and property management company.

A kitchen renovation in Burnaby typically costs $18,000–$30,000 for a budget-tier project with semi-custom cabinetry, quartz or laminate countertops, tile backsplash, and updated lighting. A mid-range renovation with new semi-custom shaker cabinetry and quartz countertops runs $28,000–$45,000. Full custom kitchens in South Slope SFH and Metrotown condos can reach $45,000–$70,000+ with waterfall islands and integrated appliances. City of Burnaby building permits for kitchen renovations with electrical or plumbing changes typically process in 1–2 weeks. Free written quotes available with detailed scope itemization.

Yes — Reno Stars handles all permit applications for Burnaby kitchen, bathroom, and basement renovations. The City of Burnaby processes residential renovation permits through its Building Approvals Department online portal. Permits are required for any renovation involving plumbing changes, electrical circuit additions or upgrades, wall modifications, or layout changes. Permit not required for cabinet replacement, countertop swaps, tile, or appliance replacements with no electrical change. City of Burnaby 2026 permit fees: minor kitchen renovation $350–$700, kitchen with plumbing modification $500–$1,100, kitchen with structural changes $800–$1,800. Standard processing takes 2–3 weeks online; complex structural projects 4–6 weeks. We submit permit packages and track approvals on your behalf.

In Burnaby's competitive SkyTrain-connected market, the highest-ROI pre-sale projects are kitchen cabinet refreshes paired with quartz countertops and a ducted range hood upgrade — particularly important for the large Chinese-Canadian buyer community around Metrotown who prioritize proper kitchen ventilation. A strategic investment of $15,000-$50,000 in kitchen and bathroom updates typically generates $30,000-$120,000 in additional sale proceeds, depending on the neighbourhood. Pre-sale renovated homes in Burnaby's $900K-$1.8M range sell 18-26 days faster than unrenovated equivalents. Fresh neutral paint and updated flooring complete the package without requiring a full gut renovation.

Choosing the right renovation contractor in Burnaby starts with verifying BC licensing. All contractors performing work over $1,000 must be registered with Consumer Protection BC. They should carry general liability insurance of at least $2 million per occurrence and WorkSafeBC coverage for all workers on your project — if an uninsured worker is injured on your property, you as the homeowner may be liable. Get at least 3 written quotes and compare them carefully: a lower quote often excludes permits, demolition, or disposal. Ask for references from 3-5 recent projects similar to yours in scope and location. Did the project finish on time and on budget? Were there surprise charges? Would they hire the contractor again? A real project portfolio with actual completed photos is a strong signal of credibility.

Refacing keeps your existing cabinet boxes and replaces doors, drawer fronts, and hardware. It costs 40-50% less than full replacement and takes less time.

Cabinet refacing in Burnaby typically takes 3-5 days for an average kitchen. Your kitchen remains functional throughout most of the process.

Most solid wood and plywood cabinet boxes can be refaced if they are structurally sound. We assess your cabinets during a free in-home consultation in Burnaby.

Ready to Start Your Cabinet Refacing Project in Burnaby?

Let us transform your vision into reality with 20 years of experience.