Poly-B Pipe Replacement in Burnaby
Trusted kitchen, bathroom, and whole-house renovations for Burnaby homes, condos, and townhouses.
About Poly-B Pipe Replacement in Burnaby
Poly-B (polybutylene) plumbing was widely installed in Vancouver-area homes built between 1985 and 1997. Two decades later, the chlorine in BC water reacts with the pipe walls, causing brittleness, micro-cracks, and eventually catastrophic leaks. As of 2025, multiple BC insurers will not renew home insurance on Poly-B properties — replacement is now a transactional necessity, not just a maintenance choice.
We replace Poly-B with PEX (cross-linked polyethylene) — the modern standard, code-approved, 50-year warranty from major manufacturers. Typical scope: re-pipe all hot/cold supply lines from the manifold to every fixture, replace shutoff valves, drywall patch behind access points, pressure-test the new system.
Real Vancouver Poly-B replacement costs:
| Property type | Replacement cost | Timeline |
|---|---|---|
| Condo (1-bath, single-floor) | $4,000 – $8,000 | 2–3 days |
| Condo (2-bath) | $6,000 – $12,000 | 3–4 days |
| Townhouse (2 floors) | $8,000 – $14,000 | 4–6 days |
| SFH (single-floor 1,500 sqft) | $10,000 – $16,000 | 5–7 days |
| SFH (2-floor 2,500 sqft) | $14,000 – $22,000 | 6–10 days |
| Luxury SFH (3-floor + ensuites) | $20,000 – $35,000+ | 10–14 days |
What's included: PEX-A or PEX-B re-pipe, all supply line connections, manifold installation, drywall patch (paint touch-up not included), pressure test, BC permit + inspection.
What's extra: Drain/waste re-piping (separate scope), hot water tank replacement, fixture replacements, full repaint of touched walls.
Why now: insurers are tightening coverage every year. Get ahead of a forced replacement at the worst possible time (after a leak, with damage repair costs piled on top). We coordinate with your insurer if needed for renewal documentation.
Poly-B Pipe Replacement Services in Burnaby
Reno Stars delivers quality renovations across Burnaby's diverse neighbourhoods — from the high-rise towers and luxury condos of Metrotown and Brentwood Park, to the quieter single-family streets of Deer Lake, Edmonds, Capitol Hill, and South Slope. As one of BC's most densely populated municipalities, Burnaby presents a unique mix of renovation challenges and opportunities, and our team has the hands-on experience to handle them all.
**Condo and Townhouse Specialists**
The majority of Burnaby's housing stock is strata-governed, which means renovation work requires careful coordination: strata approval, noise-hour scheduling, elevator booking, and debris removal protocols. Our team manages all strata logistics as a standard part of every project. From compact 600 sq ft condo bathrooms to full townhouse kitchen overhauls, we maximize every square foot without compromising on quality.
**Real Project Costs from Burnaby**
Our completed Burnaby projects give you real-world benchmarks to plan your budget:
- **[bathroom renovation](/en/guides/bathroom-renovation-cost-vancouver/)s:** $20,000–$32,000 depending on scope. A standard bathroom update (new vanity, tile, fixtures) runs $20,000–$25,000 in 2–3 weeks. A full master ensuite with custom features takes 3–5 weeks and costs $26,000–$32,000. - **[kitchen renovation](/en/guides/kitchen-renovation-cost-vancouver/)s:** $30,000–$40,000 for a full custom build. Our Burnaby kitchen projects use custom cabinetry (white shaker, wood-vein, and painted finishes), quartz countertops, and modern fixtures. Timeline: 4–6 weeks. - **Commercial renovations:** $8,000–$25,000 for retail and commercial spaces. We've completed retail fit-outs at Metrotown-area locations with minimal disruption to surrounding tenants.
**Neighbourhoods We Serve**
We work throughout all of Burnaby, including Metrotown, Brentwood, Lougheed, South Burnaby, Deer Lake, Capitol Hill, Edmonds, Highgate, and Sullivan Heights. Whether your unit is in a Brentwood pre-sale tower or a 1970s bungalow near Burnaby Lake, we bring the same standard of workmanship.
**3-Year Warranty, Licensed & Insured**
All Reno Stars projects come with a 3-year workmanship warranty. We're fully licensed and insured in BC, and we carry the strata-required liability coverage for work in managed buildings.
## Burnaby Renovation Cost Guide
Based on completed Burnaby projects by Reno Stars:
- **Kitchen renovation:** $25,000–$55,000 (condo kitchen from $25K, full house kitchen from $35K+) - **Bathroom renovation:** $18,000–$35,000 (see our [Vancouver bathroom cost guide](/en/blog/average-bathroom-renovation-cost-vancouver/)) - **Basement renovation:** $30,000–$80,000 (finished rec room or legal suite) - **Whole-house renovation:** $80,000–$200,000+
## Burnaby Neighbourhoods
We serve all Burnaby areas including Metrotown, Brentwood, Edmonds, Deer Lake, Burnaby Heights, Capitol Hill, and the University area. Burnaby's high-rise condos, townhouse complexes, and single-family homes each require different renovation approaches and strata considerations.
## Burnaby Strata Renovation Rules
Many Burnaby renovations are in strata buildings. We handle strata applications, insurance certificates, work-hour compliance, and neighbour notifications. Our team knows the requirements for major Burnaby strata buildings, saving you weeks of paperwork.
Read more: [Bathroom renovation costs](/en/blog/average-bathroom-renovation-cost-vancouver/) | [Kitchen renovation costs](/en/guides/kitchen-renovation-cost-vancouver/) | [Basement renovation guide](/en/blog/basement-renovation-vancouver-complete-guide/)
What We Do
Why Choose Our Burnaby Service
Recent Burnaby Poly-B Pipe Replacement Project
Real budget, real timeline, real scope from our portfolio.
Budget-Friendly Bathroom Renovation in Burnaby
This budget-friendly bathroom renovation in Burnaby transformed a dated space into a modern retreat. The project included a complete overhaul of the bathroom, featuring a new prefab vanity, a stylish freestanding tub, and optimized lighting. The walls were adorned with elegant gray 24x24 tiles, complemented by a sleek quartz countertop and durable vinyl flooring. The homeowner aimed for a fresh, inviting atmosphere, and the final result exceeded expectations.
- •Prefab Vanity
- •LED Mirror
- •Prefab Glassdoor
- •Demolition
- •Light Optimization
Burnaby Projects
Explore our portfolio of exceptional renovation projects across the Lower Mainland.
Budget-Friendly Bathroom Renovation in Burnaby
Family Townhouse Kitchen Renovation
Two Bathroom Renovation for Family
Frequently Asked Questions About Poly-B Pipe Replacement in Burnaby
Yes, we have extensive experience renovating high-rise condos throughout Burnaby, including towers in Metrotown, Brentwood, and Edmonds. We work within strata bylaws and coordinate material deliveries, noise-hour restrictions, and elevator bookings. Our project managers handle all strata communication so the process is seamless for you.
Based on our completed Burnaby projects, bathroom renovations typically range from $20,000 to $32,000. A standard update — new vanity, tile, fixtures, and lighting — runs $20,000–$25,000 and takes 2–3 weeks. A full master ensuite with custom features and freestanding tub costs $28,000–$32,000 and takes 3–5 weeks. These prices include labour, materials, and permits.
A full kitchen renovation in Burnaby typically takes 4–6 weeks from start to finish. This includes demolition, rough-in plumbing and electrical updates, cabinet installation, countertop fabrication and installation, backsplash tiling, and appliance connection. Burnaby condo projects may take slightly longer due to strata scheduling requirements for tradespeople and elevator bookings.
Yes. We manage all strata coordination as part of our service. This includes helping you prepare the renovation application (scope description, insurance certificates, trades list), scheduling work within approved noise hours, booking elevator access, and ensuring cleanup meets the strata's requirements. We've completed renovations in dozens of Burnaby strata buildings and understand the process inside out.
Burnaby has many homes on hillsides — especially around Capitol Hill, Burnaby Mountain, and the Deer Lake area. Sloped lots can affect drainage and moisture. We assess grading, waterproofing, and egress requirements before finishing any Burnaby basement, ensuring the space meets BC Building Code for habitable rooms.
Yes, we frequently renovate townhouses in Burnaby's major developments. We coordinate with strata management, handle shared-wall considerations, and work within the building's noise and access rules. Kitchen and bathroom renovations are our most common townhouse projects in these areas.
Poly-B (polybutylene) was used in Vancouver-area homes built between 1985 and 1997. The pipes are usually grey or beige plastic, branded with markings like "PB-2110" or "QEST". If your home is from that era and has plastic supply lines, there is a good chance some or all of the plumbing is Poly-B.
Most BC insurers will not pay to replace functioning Poly-B, but they will deny renewal or hike premiums until you replace it. We provide insurer-ready documentation after the Burnaby project completes — pressure test results, BC permit, PEX warranty — so you can return to your insurer for renewal at standard rates.
Yes. We re-pipe section by section so you have water restored at the end of each working day. Plan for short shut-offs (2-4 hours) when each fixture group is connected over to PEX. We coordinate timing with you in advance.
Poly-B Pipe Replacement in Other Areas
Ready to Start Your Poly-B Pipe Replacement Project in Burnaby?
Let us transform your vision into reality with 20 years of experience.


