Poly-B Pipe Replacement in Burnaby
Transparent poly-b pipe replacement pricing, our build process and related Metro Vancouver projects.
About Poly-B Pipe Replacement in Burnaby
Reno Stars provides poly-b pipe replacement for homeowners across Burnaby and Metro Vancouver.
Poly-B (polybutylene) plumbing was widely installed in Vancouver-area homes built between 1985 and 1997. Two decades later, the chlorine in BC water reacts with the pipe walls, causing brittleness, micro-cracks, and eventually catastrophic leaks. As of 2025, multiple BC insurers will not renew home insurance on Poly-B properties — replacement is now a transactional necessity, not just a…
What We Do
Why Choose Our Burnaby Service
Share this:
Our Recent Work in Burnaby
Real budget, real timeline, real scope from our portfolio.

Dental Clinic Renovation in Burnaby
A complete commercial renovation of a dental clinic in Burnaby, finished in just 1 week. This was our second project with this client — the first was a fireplace at their home. When the dentist needed to open as quickly as possible, the entire build-out had to be compressed into a single week. We re-planned the floor zones, traffic flow, and storage to maximize the use of every square foot, then executed the demo, drywall, electrical, plumbing, cabinetry, quartz countertops, and finishing work back-to-back. Commercial projects aren't like residential — when the clinic isn't open, the dentist isn't earning. Time is cost, efficiency is the deliverable.
Our Recent Renovation Work in Burnaby
Explore our portfolio of exceptional renovation projects across the Lower Mainland.

Dental Clinic Renovation in Burnaby

Family Townhouse Kitchen Renovation

Two Bathroom Renovation for Family
We serve Burnaby and would love to take on your poly-b pipe replacement — explore our related work above and get a free quote.
Frequently Asked Questions About Poly-B Pipe Replacement in Burnaby
Yes, we have extensive experience renovating high-rise condos throughout Burnaby, including towers in Metrotown, Brentwood, and Edmonds. We work within strata bylaws and coordinate material deliveries, noise-hour restrictions, and elevator bookings. Our project managers handle all strata communication — renovation request letters, WCB confirmation, and $5M CGL insurance certificates — and submit complete packages to the strata council before work begins. Most Burnaby stratas require 2–4 weeks for approval. We schedule trades around mandated construction hours and protect common-area floors and elevator finishes throughout the project.
Basement renovations in Burnaby typically run $40,000–$120,000 depending on scope. A basic finish — drywall, flooring, lighting and a 3-piece bathroom — starts around $40,000–$60,000 and works well for newer Brentwood and Metrotown townhouses. Mid-range projects with a second bathroom and small kitchenette run $60,000–$95,000 — typical for legal suite conversions in The Heights and South Burnaby. High-end legal suites with separate entrance, full kitchen, and premium finishes can exceed $100,000. Sloped lots around Capitol Hill and Burnaby Mountain may require additional drainage and waterproofing work. All projects include permits, $5M CGL coverage, and a 3-year workmanship warranty.
Bathroom renovations in Burnaby range from $20,000–$25,000 for a standard update — new vanity, tile, fixtures, and lighting — to $28,000–$32,000 for a primary ensuite renovation with curbless shower, heated floors, and double vanity. Tub-to-shower conversions and upgraded tile packages run $25,000–$28,000. Large-format or luxury ensuite projects with frameless glass, stone tile, and premium fixtures reach $32,000–$45,000+. South Slope and Deer Lake single-family homes built 1960s–1980s often have original tile and fixtures at the full-replacement window. A City of Burnaby permit is required for any renovation involving plumbing or electrical changes. All prices include labour, materials, and permits.
A full kitchen renovation in Burnaby typically takes 4–6 weeks from demolition to final appliance connection. The critical path includes: City of Burnaby permit processing (typically 1–2 weeks for kitchen permits with electrical or plumbing changes), cabinet fabrication lead time (3–6 weeks for semi-custom, 6–10 weeks for full custom), and countertop templating and fabrication (1–2 weeks after cabinet installation). Ordering cabinet samples and finalizing material selections before permit submission keeps the schedule tight and avoids mid-project delays. Burnaby condo projects in Metrotown and Brentwood may take 1–2 weeks longer than SFH projects due to strata construction hour restrictions and elevator booking requirements.
Yes. We manage all strata coordination as part of our service for Burnaby condo and townhouse renovations. This includes preparing the renovation application package — detailed scope description, $5M CGL insurance certificate, WCB confirmation, and contractor trades list — scheduling work within strata-mandated construction hours (typically 8am–5pm or 9am–5pm weekdays), booking elevator freight access, and ensuring post-construction cleanup meets the strata's requirements. We've completed renovations in dozens of Burnaby strata buildings — including Metrotown towers, Brentwood Park condos, and Deer Lake townhouses — and understand the approval process for each building type and property management company.
Burnaby has many homes on hillsides — especially around Capitol Hill, Burnaby Mountain, and the Deer Lake area. Sloped lots can affect drainage, moisture management, and egress window installation complexity. Before finishing any Burnaby hillside basement, we assess exterior grading, weeping tile condition, foundation wall moisture, and ceiling height at the lowest point to confirm BC Building Code compliance for habitable rooms. Homes on slopes often require sump pump installation and interior drainage membranes before framing begins. We obtain all required building and plumbing permits through the City of Burnaby and coordinate site inspections at each stage.
Yes, we frequently renovate townhouses in Burnaby's major developments including Brentwood Park, Metrotown, Lougheed, Highgate Village, and Sullivan Heights. We coordinate with strata management on the required approval packages (scope of work, insurance certificates, noise management plan) and work within the building's permitted hours and access rules. Kitchen and bathroom renovations are our most common townhouse projects in these areas. For Burnaby townhouses with shared walls, we specify resilient-channel acoustic assemblies when requested to minimize noise transmission to neighbours during and after renovation.
A kitchen renovation in Burnaby typically costs $18,000–$30,000 for a budget-tier project with semi-custom cabinetry, quartz or laminate countertops, tile backsplash, and updated lighting. A mid-range renovation with new semi-custom shaker cabinetry and quartz countertops runs $28,000–$45,000. Full custom kitchens in South Slope SFH and Metrotown condos can reach $45,000–$70,000+ with waterfall islands and integrated appliances. City of Burnaby building permits for kitchen renovations with electrical or plumbing changes typically process in 1–2 weeks. Free written quotes available with detailed scope itemization.
A bathroom renovation in Burnaby typically takes 2–4 weeks for a standard 4-piece update — demolition, waterproofing, tile, vanity, fixtures, and final clean. Full ensuite renovations with curbless shower, heated floor, and custom tile take 4–6 weeks. Condo bathrooms in Metrotown and Brentwood may take slightly longer due to strata-mandated construction hours (typically 8am–5pm or 9am–5pm weekdays) and elevator booking requirements. City of Burnaby permits for bathroom renovations with plumbing changes typically process in 1–2 weeks — we submit at project kickoff. A detailed day-by-day schedule is provided before demo begins.
Basement renovation timelines in Burnaby depend on whether you're creating a legal suite or finishing a recreation room. For a legal one-bedroom secondary suite, plan for 4–8 weeks for the City of Burnaby building permit review in 2026, followed by 8–14 weeks of construction. A two-bedroom legal suite with full code upgrades — including egress windows, height lifts, fire suppression, and separate electrical panel — takes 12–18 weeks of construction. The final inspection and occupancy approval adds 1–2 weeks. Budget 2–4 weeks for drawings and energy model if required. Total realistic timeline from design start to suite occupancy is typically 5–7 months for a Burnaby legal suite.
Yes — Reno Stars handles all permit applications for Burnaby kitchen, bathroom, and basement renovations. The City of Burnaby processes residential renovation permits through its Building Approvals Department online portal. Permits are required for any renovation involving plumbing changes, electrical circuit additions or upgrades, wall modifications, or layout changes. Permit not required for cabinet replacement, countertop swaps, tile, or appliance replacements with no electrical change. City of Burnaby 2026 permit fees: minor kitchen renovation $350–$700, kitchen with plumbing modification $500–$1,100, kitchen with structural changes $800–$1,800. Standard processing takes 2–3 weeks online; complex structural projects 4–6 weeks. We submit permit packages and track approvals on your behalf.
A legal secondary suite in Burnaby typically costs $65,000–$95,000 for a standard unfinished-to-suite conversion (8–10 weeks), or $45,000–$70,000 to convert an already-finished basement (6–8 weeks). Burnaby building permits run approximately $15 per $1,000 of construction value, so expect $1,500–$3,000 in permit fees alone. The suite must meet BC Building Code fire-separation, egress, and mechanical requirements. Burnaby City Hall’s Secondary Suite Program allows suites in most single-family zones—contact the Building Department to confirm your property is eligible before budgeting. Reno Stars provides free on-site estimates for Burnaby basement suite projects.
In Burnaby's competitive SkyTrain-connected market, the highest-ROI pre-sale projects are kitchen cabinet refreshes paired with quartz countertops and a ducted range hood upgrade — particularly important for the large Chinese-Canadian buyer community around Metrotown who prioritize proper kitchen ventilation. A strategic investment of $15,000-$50,000 in kitchen and bathroom updates typically generates $30,000-$120,000 in additional sale proceeds, depending on the neighbourhood. Pre-sale renovated homes in Burnaby's $900K-$1.8M range sell 18-26 days faster than unrenovated equivalents. Fresh neutral paint and updated flooring complete the package without requiring a full gut renovation.
Choosing the right renovation contractor in Burnaby starts with verifying BC licensing. All contractors performing work over $1,000 must be registered with Consumer Protection BC. They should carry general liability insurance of at least $2 million per occurrence and WorkSafeBC coverage for all workers on your project — if an uninsured worker is injured on your property, you as the homeowner may be liable. Get at least 3 written quotes and compare them carefully: a lower quote often excludes permits, demolition, or disposal. Ask for references from 3-5 recent projects similar to yours in scope and location. Did the project finish on time and on budget? Were there surprise charges? Would they hire the contractor again? A real project portfolio with actual completed photos is a strong signal of credibility.
In Burnaby and across Metro Vancouver — where annual rainfall averages 1,155mm — moisture resistance is the most important flooring consideration. For most homes, LVP (luxury vinyl plank) is the practical winner: it's 100% waterproof, installs at $5-$10/sqft, and performs well in kitchens, basements, and ground-floor suites. Engineered hardwood ($9-$17/sqft installed) is better for main living areas where resale value and aesthetics are the priority — it handles humidity better than solid hardwood but still isn't recommended for basements or areas near exterior doors. Solid hardwood ($12-$21/sqft) is the prestige choice but worst for moisture and should be avoided in any room exposed to Vancouver's humidity. Laminate is the budget option for low-traffic dry areas but rarely recommended for Burnaby kitchens or main floors.
Poly-B (polybutylene) was used in Vancouver-area homes built between 1985 and 1997. The pipes are usually grey or beige plastic, branded with markings like "PB-2110" or "QEST". If your home is from that era and has plastic supply lines, there is a good chance some or all of the plumbing is Poly-B.
Most BC insurers will not pay to replace functioning Poly-B, but they will deny renewal or hike premiums until you replace it. We provide insurer-ready documentation after the Burnaby project completes — pressure test results, BC permit, PEX warranty — so you can return to your insurer for renewal at standard rates.
Yes. We re-pipe section by section so you have water restored at the end of each working day. Plan for short shut-offs (2-4 hours) when each fixture group is connected over to PEX. We coordinate timing with you in advance.
Poly-B Pipe Replacement in Other Areas
Ready to Start Your Poly-B Pipe Replacement Project in Burnaby?
Let us transform your vision into reality with 20 years of experience.